Free tool

How much cash do you actually need before closing?

The deposit is only the first part. Before you get the keys you also need closing cash — land transfer tax, legal fees, development charges — plus a reserve for the things nobody can price in advance. This tool adds all three buckets together, so the number you plan around is the full cash needed, not just the deposit.

Deposits are not the full cash needed.

On a typical pre-construction purchase the cash due at closing is thousands — often tens of thousands — on top of the deposit. In the worked example below, the deposit is $100,000 and the full cash needed is $125,079.80: $25,079.80 more than the deposit alone.

Development charges / levies
Interim occupancy (condos only)

Freehold homes have no interim occupancy — occupancy is the final closing.

Enter a purchase price above to see your full cash needed — or load the worked example to see a real project's numbers.

Want these numbers checked against a real project?

Send me the project name — I'll verify the deposit, closing costs and HST basis against the builder's price list.

WhatsApp Sam

Worked example: North Gate Trails, 30′ detached

A real, verified project — not a hypothetical. North Gate Trails by Lakeview Homes, North Ajax. 30′ detached from $799,990 net of the HST rebate (builder price list, Nov 3, 2026). Deposit $100,000 staged to 150 days, cheques to Estates of Northgate Inc. Closing costs capped at $8,500 + HST. Tentative closings from October 2027. First-time buyer, so the $4,000 land transfer tax refund applies. See the North Gate Trails listing.

Deposit — staged to 150 days$100,000.00
Land transfer tax (Ontario, on $799,990)$12,474.80
First-time buyer LTT refund−$4,000.00
Land transfer tax, net$8,474.80
Legal + disbursements (estimate)$2,000.00
Development charges / levies (builder cap $8,500 + HST)$9,605.00
Interim occupancy$0.00 — freehold detached, no interim occupancy
HST — additional rebate$0.00 — price already net of the rebate
Closing cash (due at final closing)$20,079.80
Reserve (example buffer — your choice, not a rule)$5,000.00
Total cash needed before closing$125,079.80

HST check: the price is already net of the HST rebate, so no further rebate applies (rebate $0.00 — never calculate a rebate from a price already net of it). The $5,000 reserve is an example buffer, not a rule — set your own in the calculator above. Figures checked November 6, 2026; the builder's terms can change — confirm against the agreement before signing.

What counts as cash needed

1. The deposit. Paid in instalments during construction, held in trust, and credited toward the purchase price at closing. It is the largest single cash item — and the only one most buyers plan for.

2. Closing cash. Due at final closing, on top of the deposit: Ontario land transfer tax (less the first-time buyer refund of up to $4,000, where eligible), legal fees and disbursements, development charges and levies (capped by some builders, uncapped by others), and HST where the price is not already net of the rebate. Interim-occupancy fees apply to condos between occupancy and final closing; freehold homes have no interim occupancy.

3. A reserve. Appraisal shortfalls, moving costs, and the first months of ownership do not fit in a formula. Hold a buffer you choose — the tool defaults to $5,000 as an example only.

The HST basis matters. Ontario's enhanced HST relief is three separate streams, and their maxima do not add together: the all-buyer enhanced relief (up to $130,000 combined, agreements April 1, 2026 – March 31, 2027), the federal first-time buyer GST rebate (up to $50,000), and the Ontario first-time buyer provincial rebate (up to $80,000). A price already net of the rebate has no further rebate to claim. A price with HST on top can carry a large HST bill at closing, partly offset by the rebate. Confirm the basis with the builder — the calculator warns you when it is not stated.

Assumptions and limits

Keep reading

Figures checked November 6, 2026. Author: Findle Global Editorial Team. Prices, incentives and closing dates change — verify against the builder's price list before an offer.